It is used in the construction of bridges with large seas and high elevations on the Nile It was used for the first time in the construction of a...
Since 1967.We have 50+ years of experience in Bridges and Specialized Structures . A specialized department in constructing bridges, and its activities vary to include water and drainage projects, public buildings, and tunnels. It has contributed to achieving development plans by implementing most of the major and vital projects in Greater Cairo and the governorates of Egypt, by applying the latest technologies in the field of construction with the best standards of quality and accuracy.
It is used in the construction of bridges with large seas and high elevations on the Nile It was used for the first time in the construction of a...
15th of May Bridge (Zamalek Elevated Road) 1986 15th of May Bridge (Deck Pushing System)
The Movable Girder System for overhead erection is an advanced engineering solution designed to efficiently address the challenges of congested sites,...
Climbing shuttering systems are commonly used in the construction of various types of bridges, including :
The Arab Contractors has 3 complete Flying Shuttering systems This system was used in 6th of October elevated road as well as in Suez Canal Bridge β...
It is a popular bridge design due to its aesthetic appeal and structural efficiency It is used in the construction of Tahya Masr Bridge (Rod El-Farag...
Under implementation
The bridge is two prestressed concrete elevated from Cairo airport to Down Town and vice versa (1180 m long - 21 m wide ) in addition to 6 inlet...
View Details
Under implementation
The bridge is crossing the River Nile with total length of 5 km. (500 m for the river part 35 m wide ) . It has three navigation vents (75m - 130m...
View Details
Under implementation
This project consists of a tunnel, bridge works and a road with length 5.5km as follows:
1.Bridges works:
Two elevated pre-stressed concrete...
Under implementation
King Faysal bridge is a three-level bridge , 4 kilometres length , its width is ranging from 8.5 to 19 metres. The historic and touristic location...
View Details
Under implementation
Owner: Ministry of Transport and Communication β General Authority for Roads and Bridges Contractor: The Arab Contractors (Osman Ahmed Osman &...
View Details
Under implementation
The Giza Bridge marks the beginning of the Egyptianization of the bridge industry in Egypt, initiated by Arab Contractors, after it had been the...
View Details
Under implementation
It is a steel flyover crossing Upper Egypt Railway at Giza
View Details
Under implementation
Value: EGP 300millionThe longest and largest bridge in Egypt, measuring 18.705 kilometers long and ranging in width from 14 to 34 meters,...
View Details
Under implementation
The bridge connects the Cairo/Alexandria Agricultural Road, the Cairo-Alexandria Desert Road, and the center of Alexandria at Moharram Bek...
View Details
Under implementation
Owner: Cairo Governorate - Roads and Bridges AuthorityExecuting Agency: Arab Contractors Company "Osman Ahmed Osman & Partners" - Bridges...
View Details
Under implementation
The Client: Engineering Authority for the Armed Forces "Military Engineers Department"The...
View Details
Under implementation
Contract Value: 115 EGP millionExecution Method: Soil treatment by installing water screens, settlement measurements gauges β which is...
View Details
Under implementation
Construction of an axis, with a total length 2km. It is starting from the axis's inlets and outlets connected with the Eastern Arc of the Ring...
View Details
Under implementation
The project is within the governmental plan for unprecedented breakthrough in roads and bridges sector to solve the traffic problem.The company...
View Details
Under implementation
El Merghany Bridge at the intersection of Al Orouba is representing one of the governmental projects launched by President Abdel Fattah El Sisi....
View Details
Under implementation
The Bridge of Martyr Hesham Barakat is among the development works of East Cairo to accommodate the traffic density in the squares of Nasr City to...
View Details
Under implementation
Al Amiriya Bridge is considered one of the national projects which will contribute on achieving traffic liquidity in the Capital; it comes within...
View Details
Under implementation
It is the first bridge in Egypt to be constructed into the sea , with total length of 400 m. Considered of 6 spans , It constitute amajor part of...
View Details
Under implementation
The project is considered an important axis to complete the Ring Road and connects Suez and Ismailia desert roads, Alexandria-Cairo agricultural...
View Details
Under implementation
It connects Sinai Peninsula to the main land of Egypt over Suez Canal. The project is of strategic importance to Egypt as it caters for the...
View Details
Under implementation
The bridge connects Cairo and Giza governorates with a total length of 2 km and a width ranging from 42 to 45 m. The bridge is constructed using...
View Details
Under implementation
The first phase starts at Lebanon Square and ends intersecting with Cairo-Alexandria desert road. The second phase starts from Lebanon square to...
View Details
Under implementation
Construction of Cairo University - Saft El Labn Axis, with a total length 4250 ml.The project starting date is 1st June, 2007.The...
View Details
Under implementation
It links Cairo governorate and Qalioupiya governorate crossing Ismailia Canal at Mostorod area. The length of the bridge is 600 L.M. and 22 L.M....
View Details
Under implementation
The owner: The General Authority for Roads and BridgesContractual value: 270 million Egyptian...
View Details
Under implementation
(intersection of the Ring Road and Ismailia Road) - Egypt The project is part of the governmental plan which...
View Details
Under implementation
It represents the last section of the west part of Greater Cairo-ring road, ending in Cairo-Alexandria desert roadwith total contract value...
View Details
Under implementation
The project is aiming at linking between the East and West of the city through the bridge crossing the railway cross, overcoming the traffic jam on...
View Details
Under implementation
The Arab Contractors Company under the supervision of the Armed Forces Engineering Authority β Military Engineers Department implemented Taha...
View Details
Under implementation
The bridge consists of 3 lanes in each direction, with a length of 950 m, to connect the northern and southern axes of Muhammad Naguib, and...
View Details
Under implementation
The Axis of Lieutenant General Kamal Amer in Giza Governorate will contribute to solving many traffic problems in Giza and alleviating traffic jams...
View Details
Under implementation
The project represents the most important portion of the third ring road around Greater Cairo, starting from EI-Fayoum desert road, linking the new...
View Details
Under implementation
The main purpose of Ahmed Orabi Axis is reducing the traffic jam on 26th of July Axis by making new Axis linking El Mohandseen area with the Ring...
View Details
Under implementation
The Owner: Ministry of Public WorksThe Consultant: Louis Berger Group Inc., in JV with Pan Arab Consulting EngineerThe Contractor:The Arab...
View Details
Under implementation
Bani Mazar Bridge is the most important project in Upper Egypt and itβs a freeway links Red Sea Governorate with Upper Egypt governorates through...
View Details
Under implementation
El Kebash Bridge in Luxor. The road's objective is to connect the East and West Nile in order to help El Kebash archaeological road become a...
View Details
Under implementation
Gerga Axis Bridge built on the shore of the River Nile in Sohag, with total length 10km and width 21m. it is consisting of navigational pathway...
View Details
Under implementation
The project is being implemented to achieve the targeted plan of Assiut Governorate to solve the problem of railway crossings, serve the city of...
View Details
Under implementation
The Arab Contractors has successfully completed the rehabilitation and upgrading of El Galaa Bridge on Salah Salem Road in just 48 days of nonstop...
View Details
Under implementation
It is the first hydraulic bridge for heavy transport and containers in Port Said and aims to facilitate the navigation movement of the Suez Canal...
View Details
Under implementation
The Alternative Axis for Aswan Reservoir is one of the transverse axes that President Abdel Fattah El Sisi has directed to be implemented in order...
View Details
Under implementation
Owner: Armed Forces Engineering Authority.Consultant: SAAD International Consultant Engineers...
View Details
Under implementation
Ganbaway Bridge in Beheira Governorate comes within the development of Cairo/Alexandria Agricultural Road by eliminating surface intersections and...
View Details