Manqabad Overpass Bridge in Assiut - Egypt
Bridges & Flyovers Completed

Manqabad Overpass Bridge in Assiut - Egypt

Country
Egypt
City
Assiut
Start Date
2025
Project Status
Completed

About the Project

The project is being implemented to achieve the targeted plan of Assiut Governorate to solve the problem of railway crossings, serve the city of Manqabad and the surrounding villages, and eliminate congestion at the entrance to the city. The length of the bridge, including the exists and entries, is 1900m long and 16.70m wide, passing over the railway lines (Cairo - High Dam) and over the waterway of Ibrahimia Canal.
The Arab Contractors Company has completed the installation of the main beams of the last steel span in Manqabad Overpass Bridge in Assiut, above Cairo-Aswan railway lines, within 3 hours, which is a record time, without affecting the movement of trains and with full adherence to safety procedures.
The length of the steel span is 34m, with a total weight of 175 tons, using a 400-ton crane. It is the last span to be implemented in the project, through cooperation between Assiut branch, Central Workshops and Factories Department, Equipment Hiring Department, and Heavy Transport Department.

Key Features

Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Client
N/A
Start Date
2025/01/01
Space
1900 متر طولى وعرض 16.70 متر
Video

Project Video