Beni Suef Bridge - Egypt
Bridges & Flyovers Completed

Beni Suef Bridge - Egypt

Country
Egypt
City
Beni Suef
Start Date
1985
Project Status
Completed

About the Project

Owner: Ministry of Transport and Communication – General Authority for Roads and Bridges Contractor: The Arab Contractors (Osman Ahmed Osman & Co.) – Bridges Department Consultants: The Arab Consulting Engineers. Dr. A.Moharram – Dr. M.Bakhoum Date of handling over: 20 October 1985 Description: The bridge connects Beni Suef City (West) with the eastern area crossing the River Nile. - Length: 1086 metres - Width: 21 metres Foundations: one caisson and 268 benoto piles diameter 1.30 metres. No. of piers: 18 (12 of it in the water way) Superstructure: prestressed concrete Prestressing system: longitudinal in webs and top slab: Dywidag multiple strand tendons 12 - 0.6 inches steel 1570/1770 Transverse prestressing in top slab Dywidag multiple strand tendons 4 - 0.6 inches steel 170/190 Shear bars: Dywidag single bar tendons ? 36mm steel 1835/1030 System of construction: Cantilever Carriage System over the River Nile for constructing 174 metres.

Key Features

Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Client
Ministry of Transport and Communication – General Authority for Roads and Bridges
Start Date
1985/01/01
Space
الطول: 1086 متر - العرض: 21 متر