Greater Cairo Metro Line 3 - Phase 3C
Transportation Completed Iconic Project Award-Winning

Greater Cairo Metro Line 3 - Phase 3C

Country
Egypt
City
Giza
Start Date
2024
Project Status
Completed

About the Project

Client: National Authority for Tunnels (NAT) - Ministry of Transport
Contractors: EFJV of Vinci Construction, The Arab Contractors Company and Orascom Construction

CML3-Phase 3 extends for a length of 17.7 km and includes 15 stations, from Attaba Station to Kit Kat Square, heading north to Imbaba, reaching the Ring Road, and branching south to Mohandseen and Boulak El Dakrour, passing through Wadi El Nile Street and Gameat El Dewal, and then extending to Cairo University. It is implemented in three parts. In October 2022, the first part of it was opened with a length of 4 km and 4 underground stations, which achieved, with its opening, the exchange of passenger transport service between the third and first lines of the metro.

Phase 3C

It is 7.1 km long and includes (3) underground stations (Al-Tawfiqia - Nile Valley - Gamaet Al-Dawal) + (1) an overhead station (Cairo University) + (1) a surface station (Boulaq Al-Dakrour).
 

Key Features

Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Client
National Authority for Tunnels (NAT) - Ministry of Transport
Start Date
2024/01/01
Space
طـول 7.1 كم وتشتمــل علي (3) محطات
Awards

Awards and Honors

Cairo Metro Line3 - Phases 3B & 3C, won the award in the transport projects category
Cairo Metro Line3 - Phases 3B & 3C, won the award in the transport projects category
Cairo Metro Line3 - Phases 3B & 3C, won the award in the transport projects category, which was implemented by the Arab Contractors under the supervision of the National Authority for Tunnels – Ministry of Transport