Abu Muslim Wastewater Lifting Station in El Tod City - Luxor - Egypt
Water & Wastewater Completed

Abu Muslim Wastewater Lifting Station in El Tod City - Luxor - Egypt

Country
Egypt
City
luxor
Start Date
2025
Project Status
Completed

About the Project

Abu Muslim Wastewater Lifting Station in El Tod City, Luxor Governorate, implemented by the Arab Contractors Company, Red Sea Branch.
The main station consists of a 15.5 km slope network and a 2.840 km discharge line, with a design capacity of 160 liters/second. The project also includes several buildings, including the lift building, a storage area, a transformer, and a generator. The main building (the lift building) contains two submersible pumps, each with a capacity of 80 horsepower, in addition to a backup pump with a capacity of 65 liters/second. The station also houses the main operating panel, electrical panel, measuring devices, a water hammer, cranes, and main valves.
The station serves approximately 14,000 people at a total cost estimated at EGP 90 million.

Key Features

Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Client
N/A
Start Date
2025/01/01
Space
طول 15.5 كم، وخط طرد بطول 2.840 كم