The project scope of work: the sanitation infrastructure for Serowe village , to cater for residential, commercial, industrial and institutional plots. The sewerage network is consisting of:
β’360 Km of UPVC pipes with varied diameters ranged from 110 mm up to 500 mm;
β’7600 manholes;
β’2.7 Km pressure lines from UPVC pipes 200 mm;
β’6 lifting stations;
β’In addition to the electro-mechanical works, 2 treatment ponds with 2 lifting stations and telemetry systems