Pyramids Plateau Groundwater Lowering Project - Egypt
Water & Wastewater Completed

Pyramids Plateau Groundwater Lowering Project - Egypt

Country
Egypt
City
Giza
Start Date
2016
Project Status
Completed

About the Project

Client: The Executive Authority for Drinking Water and Sanitation
Consultant: AECOM & ECG
Project value: 137 533 27 pounds

Project description:
1- Implementation of (14) new wells to reduce the groundwater level, which were increased to (16) wells
2- Disinfection and operation of (4) old wells, two of them were converted to new wells
3- Construction of a high-density polyethylene (HDPE) expulsion line of approximately 2.5 km length to drain wells water on the covered drainage of Mansourieh Canal
4- Implementation of the necessary industrial work to drain the water into the covered drainage of the Mansourieh Canal at the end of the expulsion line
5- Construction of a building to control pumps consisting of (3) rooms
6- Establishment of the necessary valve chambers above all wells and on the path of the expulsion line

Key Features

Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Client
N/A
Start Date
2016/01/01
Space
N/A