Greater Cairo Metro Line 3 - Phase 3B
Transportation Completed Award-Winning

Greater Cairo Metro Line 3 - Phase 3B

Country
Egypt
City
Giza
Start Date
2023
Project Status
Completed

About the Project

Client: National Authority for Tunnels (NAT) - Ministry of Transport
Contractors: EFJV of Vinci Construction, The Arab Contractors Company and Orascom Construction

CML3-Phase 3 extends for a length of 17.7 km and includes 15 stations, from Attaba Station to Kit Kat Square, heading north to Imbaba, reaching the Ring Road, and branching south to Mohandseen and Boulak El Dakrour, passing through Wadi El Nile Street and Gameat El Dewal, and then extending to Cairo University. It is implemented in three parts. In October 2022, the first part of it was opened with a length of 4 km and 4 underground stations, which achieved, with its opening, the exchange of passenger transport service between the third and first lines of the metro.

The second part (3B)

It is 6.6km length; extends from El Kit Kat to the final station at Rod El Farag Axis. It includes 6 stations (underground station: El Sudan, 4 elevated stations: Imbaba - El Bohy – El Qawmia El Arabia and the Ring Road, at-ground level station: the final station at Rod El Farag Axis.
 

Awards

Key Features

Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards