The project comprises establishment of 10 opening barrage for regulating the water at Ismailia canal and a lock 9*120m , after removing the existing old barrage
Key Features
Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Client
N/A
Start Date
2007/01/01
Space
N/A
Other Projects
Similar Projects
Agriculture & Irrigation
Salhia Agro-Industrial Projects - Egypt
This is the first Agro-industrial project in Egypt, of total area amounting to 56.500 acres, which was a desert area before. The area located among the governorates: Cairo, Ismailia and Sharkia is composed of two major parts: Salhia 23000 acres. The Youth province 33500 acres. The whole project
The High Dam is one of the largest and most important projects in Egypt. The project represents a unique technical and administrative challenge and provides electricity to nearly half of Egypt's population, in addition to creating a huge water reservoir behind the dam. This reservoir has
The project consists of the construction of the 17m wide, 221m long and 14.6m depth navigation vent. The lock body consists of 7 joints, 20.6m long each. The front entrance is 32m long while the back entrance is 29.3m in length. Our scope includes also the construction of a bridge that rests over
It is considered one of the biggest wheat silos in Egypt with a storage capacity 90000 tons with total value 110.680 million EGP for local component and 7 million US$ for foreign component. This project is one of the funded projects by OPEC and the beneficiary is the Egyptian Holding Company for
The capacity of the plant is 95000m3/d total area is 30 acers. Our scope of work is consisting of inlets and screens, 22 primary and final sedimentation basins , biological aeration tanks &2 chlorine mixing tanks
"The project is built on 50 Feddans (750x280m), its space has been expanded to 260 Feddans in Abu Zaabal area, left side from Cairo-Belbis desert road, Kilo34. the project is consisting of: main building, adjoining services buildings such as:(control rooms, electricity plant, water tanks, water