Construction of floating quay carrying 10 automatic suckers, cranes, fire fighting equipment, 10 steel silos & main store on an area of 3000m2.
Key Features
Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Client
N/A
Start Date
1987/01/01
Space
N/A
Other Projects
Similar Projects
Ports & Marinal Works
Dammietta Port
The Arab Contractors designed and executed the project in a consortium with the French company S.G.E and the Japanese company, Mitsui. The harbour is composed of 18 quays and is built on an area of 2 700 acres . The draft is about 12 to 15m . The harbour capacity reaches 17 million tons annually,
The Arab contractors won the tender against five international competitor companies. The project is mainly a 104m long quay of 22m width. The quay is made of layers with a special design, the quantity is a bout 50000m3. The project also includes a building for goods as well as networks for: roads
Representative of the Owner: Engineering Authority for the Armed Forces Consultant: SYSTRA Contractors: JV of the Arab Contractors Company and Orascom Construction Project Description: Two tunnels for cars, the
Execution of armlets, concrete pavements, rocks supply and stuff, concrete blocks, preparing of entertaining areas in Ras Jannat area – Boumordas state. Contract between Jetrac & Meditram Meditram responsible for supplying 340 thousand ton. of rocks and stones. The Arab Contractors will carry
It is the First phase of the quays of East Port Said. Its total length reached 5km. There are 5 companies assigned to implement it; the Arab Contractors Company implemented 1000ml of the quays divided into Zone 4 and Zone 5. Each one of them has 500m length; with a total value 950 million
One of the major port development projects in Egypt. It is located along the Mediterranean Coast in Alexandria and is built to accommodate trade. The project included the construction of the quays, breakwater, dredging the navigation channel and all the associated necessary