Built on 40 acres, 20Km south of Imsailia, it is the biggest power station , production-wise in Egypt . The power generated from the already built three units is 450 megawatt annually. Presently, a fourth unit is being, its production capacity is 150 megawatt annually .
Key Features
Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Client
N/A
Start Date
1986/01/01
Space
N/A
Other Projects
Similar Projects
Power Stations
Riyadh Power Plant - Saudi Arabia
Name: Riyadh Power Plant Value: 6,750,000 Saudi Riyals Completion Date: 1955 Location: Kingdom of Saudi Arabia
Ismailia Guidance Tower for monitoring navigational traffic. The building consists of 13 floors, each with an area of 3,000 square meters, and includes 400 rooms and 8 halls
The project includes 48 buildings (facilities, administrative and stores ), water intakes and a small river port on the west Nile bank . In addition to two thermal units (5th&6th) with a capacity of 660 MW. Total contract value(EGP):168.5 million.
Kurimat II Combined Cycle Power Plant Project of 750 MW - Egypt
The plant is aimed to produce electrical power of 750 MW. It is based on the combined cycle technique that utilises both Steam and Gas for the turbine generators. The amount of reinforced concrete is 40,000m3, the weight of the steel structures are of 3000 tons, the amount of the excavated
It connects Sinai Peninsula to the main land of Egypt over Suez Canal. The project is of strategic importance to Egypt as it caters for the requirements of the emerging economical and social development in Sinai. The project was contracted to three main contractors, whereby the Arab Contractors
It is one of the largest electrical stations in the Middle East. It is operated by natural gas & mazout. It is located on the west shore of Sinai (644 M.W.). The Arab Contractors scope of work included civil works package and the electromechanical activities. The project was executed by a