Tunnel of Prince Majed Street Intersection with Rawdah Street
Residential Completed

Tunnel of Prince Majed Street Intersection with Rawdah Street

Country
Saudi Arabia
City
Jadah
Start Date
2011
Project Status
Completed

About the Project

Construction of a car tunnel with a total length of 710 m and a width of 29m; the length of the covered part is 205 m. The tunnel has two lanes, each 13.5m wide, an intermediate platform 2m wide, a diaphragm wall 60cm thick and 55m long, and secant piles 655m long. The electromechanical work consists of 3 pumping rooms, including 9 deep pumps, a lighting and ventilation system, distributing panels, fans, and a piping system. In addition to pavement and landscaping works.
The tunnel width is 26 m divided into three lanes.
Value : 95 million SR

Key Features

Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Start Date
2011