Religious Buildings
Completed
Iconic Project
Award-Winning
Al Fatah Al Aleem Mosque
About the Project
The mosque is located on the New Middle Ring Road and it is considered one of the mega mosques worldwide.
The total capacity of the mosque and the praying area in the basement and the outdoor prayer space is 17000 persons.
It is built upon a total area of 106 feddans (445.5 thousands m2).
Fencing works: total length of 3150 ml.
The minarets: it is according to the Fatimid style, its total number 4 minarets with 95m height without the crown and the crescent; it is equivalent to 31 floors in height and each minaret has 4 balconies. The minarets are topped with stainless steel crescents treated with PVD to give it the golden brightful color with a height 4.5m.
The total number of domes is 21 dome varied in height and diameter as follows:
A main dome: 33m diameter, 44m height and total weight 5000 ton.
4 secondary domes: 11.75 diameter, 9m height topping the mosque's ceil, 24m higher than the mosque's surface level. Beneath the secondary domes there are 4 domes from the stained glass.
6 domes above the entries: 7.5m diameter, 7m height above the entry ceil and 19m from the floor surface, beneath them there are 6 domes from the stained glass.
10 domes above the gates of the walls: 5m diameter, 3.10m height and a total solid height 15m from the bottom.
The mosque nave is 6325m2 which accommodates for 6300 prayers with 5 main entrances in addition to 2 entrances for women. In addition to these, there is the outdoor prayer space built upon 3400m2 and accommodates 3400 persons.
The mosque includes 2 Quraan memorization houses for boys and girls on 340m2, a library on 395m2, the administrative offices, the generator chamber, 2 control rooms for electricity, the stores, the conference room for 40 persons equipped with 94 WCs for men and women and a water tank with a capacity of 3500m3.
Key Features
Distinctive Architectural Design
Modern design meeting the highest standards
Professional Project Management
Integrated coordination among all stakeholders
High Safety Standards
Full commitment to safety regulations
Exceptional Quality
Execution with the highest quality standards
Start Date
2019
End Date
2019
Video