Eng: Hassan Ibrahim
Biography
Eng. Hassan Ibrahim has more than 20 years of experience in the fields of roads, bridges, tunnels, and project management.
Prior to assuming his current position, he held several leading positions as Executive Board Member of the Arab Contractors Company (2023 - January 2025), Manager of the Joint Ventures Department (2017 - present), Project Manager of Light Rail Transit (LRT) “New Capital / 10th Of Ramadan” for the Egyptian Consortium “the Arab Contractors/Hassan Allam / Petrojet / Concord” (2019 - 2023), besides supervising Cairo Metro Line 3 - Phase 3 (2016 - Present), Project Manager of Cairo Metro Line 3 - Phase 4B (2020 - Present), in addition to managing the technical and financial study for CML3 – Phase 4B (2015-2016). During his work at the Bridges and Specialized Structures Department, he served as the Technical Office Manager for Tahya Misr Cable-Stayed Bridge "Rod El Farag Axis" (2014-2015), Project Manager of Al Amiriya Wastewater Plant (2013-2014), Technical Office Manager (2012-2013), Technical Office Engineer (2010-2012), and Construction Engineer (2005-2010).
Eng. Hassan Ibrahim has many achievements due to his wide spectrum experience in various engineering fields, for example: leading several negotiations with the National Authority for Tunnels and the Ministry of Transport to sign contracts for many national projects, especially in the field of transportation, such as: the High Speed Rail “HSR”(Ain Sokhna - El Alamein - Marsa Matrouh), Cairo Metro Line 3 - Phase 4B, Cairo Metro Line 4 - Phase 1, as well as the project study and signing a memorandum of understanding “MoU” for Cairo Metro Line 3 - Phase 4C; in addition to winning several bids such as Dabaa Nuclear Power Plant and the Development and Modernization of Torra Workshop, as well as direct supervision of major projects such as the Cairo Metro Line 3- Phase 3, and Light Rail Transit (LRT) – (New Capital / 10th of Ramadan); in addition to follow up and implementation of projects such as Al Amiriya Wastewater Plant, Al Hawamdiya Bridge, Jawharat El Haras Al Gomhoury “the Jewel of the Republican Guard”, and the Restoration of the University Hospital (Alexandria Branch).
Education:
B.Sc. of Civil Engineering - Alexandria University (2004).
Career Timeline
Executive Board Member
Arab Contractors Company
Project Director
Cairo Metro Line 3, Phase 4B
Project Director – Light Rail Transit (LRT
for the Egyptian Consortium (Arab Contractors – Hassan Allam – Petrojet – Concord
Director
Joint Projects Department
Direct Supervisor
Cairo Metro Line 3, Phase 3
Head of Study Team
Cairo Metro Line 3, Phase 4B
Technical Office Manager
Tahya Misr Cable-Stayed Bridge -Rod El-Farag Axis
Project Director
El-Amiriya Wastewater Treatment Plan
Technical Office Manager
El-Amiriya Wastewater Treatment Plant
Technical Office Engineer
.
Construction Engineer
.
Work Experience
High-Speed Rail (HSR)
Ain Sokhna – Alamein – Matrouh
Cairo Metro
Line 4 – Phase 1
MoU for Cairo Metro
Line 3 – Phase 4C
Securing major bids
Dabaa Nuclear Power Plant Renewal and upgrading of Tora Workshop
Supervising major national projects
Cairo Metro Line 3 – Phase 3 Light Rail Transit (LRT): New Administrative Capital – 10th of Ramadan
Overseeing and contributing to important projects
El-Amiriya Wastewater Treatment Plant Al-Hawamdeya Bridge Republican Guard Jewel Project University Hospital Restoration
Leadership in Action
Eng: Hassan Moustafa
Senior Vice Chairman
Dr.Mohamed Ansi Al-Bishouti
Vice Chairman of the Board of Directors
Eng: El Sayed Abd el-Khaleq Al-Wazir
Vice Chairman of the Board of Directors
Eng: Heba Abo El-Ela
Vice Chairman of the Board of Directors
Dr. Eng. Ahmed El-Adalany
Board Member
Eng: Dina Mohamed Adel
Board Member of Arab Contractors.
Eng: Mohamed Alawi
Board Member of Arab Contractors.