Eng: Hassan Ibrahim Photo

Eng: Hassan Ibrahim

Board Member of Arab Contractors.

Biography

Eng. Hassan Ibrahim has more than 20 years of experience in the fields of roads, bridges, tunnels, and project management.
Prior to assuming his current position, he held several leading positions as Executive Board Member of the Arab Contractors Company (2023 - January 2025), Manager of the Joint Ventures Department (2017 - present), Project Manager of Light Rail Transit (LRT) “New Capital / 10th Of Ramadan” for the Egyptian Consortium “the Arab Contractors/Hassan Allam / Petrojet / Concord” (2019 - 2023), besides supervising Cairo Metro Line 3 - Phase 3 (2016 - Present), Project Manager of Cairo Metro Line 3 - Phase 4B (2020 - Present), in addition to managing the technical and financial study for CML3 – Phase 4B (2015-2016). During his work at the Bridges and Specialized Structures Department, he served as the Technical Office Manager for Tahya Misr Cable-Stayed Bridge "Rod El Farag Axis" (2014-2015), Project Manager of Al Amiriya Wastewater Plant (2013-2014), Technical Office Manager (2012-2013), Technical Office Engineer (2010-2012), and Construction Engineer (2005-2010).
Eng. Hassan Ibrahim has many achievements due to his wide spectrum experience in various engineering fields, for example: leading several negotiations with the National Authority for Tunnels and the Ministry of Transport to sign contracts for many national projects, especially in the field of transportation, such as: the High Speed Rail “HSR”(Ain Sokhna - El Alamein - Marsa Matrouh), Cairo Metro Line 3 - Phase 4B, Cairo Metro Line 4 - Phase 1, as well as the project study and signing a memorandum of understanding “MoU” for Cairo Metro Line 3 - Phase 4C; in addition to winning several bids such as Dabaa Nuclear Power Plant and the Development and Modernization of Torra Workshop, as well as direct supervision of major projects such as the Cairo Metro Line 3- Phase 3, and Light Rail Transit (LRT) – (New Capital / 10th of Ramadan); in addition to follow up and implementation of projects such as Al Amiriya Wastewater Plant, Al Hawamdiya Bridge, Jawharat El Haras Al Gomhoury “the Jewel of the Republican Guard”, and the Restoration of the University Hospital (Alexandria Branch).
Education:

B.Sc. of Civil Engineering - Alexandria University (2004).

Career Timeline

2023 - Present

Executive Board Member

Arab Contractors Company

2020 - الآن

Project Director

Cairo Metro Line 3, Phase 4B

2019 - الآن

Project Director – Light Rail Transit (LRT

for the Egyptian Consortium (Arab Contractors – Hassan Allam – Petrojet – Concord

2017 - الآن

Director

Joint Projects Department

2016 - الآن

Direct Supervisor

Cairo Metro Line 3, Phase 3

2015 - الآن

Head of Study Team

Cairo Metro Line 3, Phase 4B

2014 - الآن

Technical Office Manager

Tahya Misr Cable-Stayed Bridge -Rod El-Farag Axis

2013 - الآن

Project Director

El-Amiriya Wastewater Treatment Plan

2012 - الآن

Technical Office Manager

El-Amiriya Wastewater Treatment Plant

2010 - الآن

Technical Office Engineer

.

2005 - الآن

Construction Engineer

.

Work Experience

High-Speed Rail (HSR)

Ain Sokhna – Alamein – Matrouh

Cairo Metro

Line 4 – Phase 1

MoU for Cairo Metro

Line 3 – Phase 4C

Securing major bids

 Dabaa Nuclear Power Plant Renewal and upgrading of Tora Workshop 

Supervising major national projects

Cairo Metro Line 3 – Phase 3 Light Rail Transit (LRT): New Administrative Capital – 10th of Ramadan

Overseeing and contributing to important projects

 El-Amiriya Wastewater Treatment Plant Al-Hawamdeya Bridge Republican Guard Jewel Project University Hospital Restoration